We are doing bored cast in situ piles using the most advanced hydraulic rotary drilling rigs with pile diameter ranges from 500 mm to 2600 mm
Read MoreShoring is a temporary work mainly to facilitate the construction of a retaining wall. According to site condition, project requirement
Read MoreWe are doing excavation and disposal work. Required excavator and dumping trucks are available to deploy at site
Read Moreo keep excavated platform dry either for further excavation or to facilitate casting raft and other sub-structures, efficient dewatering
Read MoreWe have a team of experienced engineers, technicians, and state-of-the-art equipment to meet the vast challenges of ground engineering
Read More