01
Piling Works
We are doing bored cast in situ piles using the most advanced hydraulic rotary drilling rigs with pile diameter ranges from 500 mm to 2600 mm and a maximum depth of 72.0 m.
Read More 02
Shoring Works
Shoring is a temporary work mainly to facilitate the construction of a retaining wall. According to site condition, project requirement, and sub-soil & groundwater
Read More 03
Excavation works
We are doing excavation and disposal work. Required excavator and dumping trucks are available to deploy at site according to site requirement.
Read More 04
Dewatering Works
To keep excavated platform dry either for further excavation or to facilitate casting raft and other sub-structures, efficient dewatering
Read More 05
Ground engineering works
We have a team of experienced engineers, technicians, and state-of-the-art equipment to meet the vast challenges of ground engineering
Read More